Monday, 17 September 2012

The next thing

We're sitting here at 8am waiting for the Fletchers-EQR contractors, Dixon & Dixon. They were supposed to be here at 7.30, but it's Monday, so they probably have the same trouble getting started as the rest of us do.

We've cleared most stuff out of the kitchen, where they will rip up the cracked floor tiles and lay bamboo flooring. The other area for major attention is the garage, where they'll inject resin into a floor crack, then gib-stop and paint the walls.

For the next two weeks, we'll be working with the fridge in the dining room, freezer in a bedroom, and the pantry contents on shelves in the lounge. (And wine in another bedroom.) The garage contents are stacked in the newly built garden shed until we can move them back; hopefully this time we'll achieve a more logical layout when we re-stack the garage shelves.

No comments: